Home & Garage Demolition in Chester, CA

Find the right contractor to demolish and remove anything

America's #1 Source for Local Demolition Experts

34639, 20009, 34131
Compare Demolition Quotes
KC

Kirack Construction Inc.

Susanville, CA

At Kirack Construction Inc., we provide expert help with every project, from demolition to construction, remodeling, and more. Our affordable services, including house and garage demo, are available with a free quote. Call today! more

TE

Turner Excavating Inc

Westwood, CA

You can rely on Turner Excavating, Inc. to provide you with the absolute best in services when you need them. Their services include demolition, septic system installation, site preparation, grading, new construction, excavating, trucking, snow removal, and more. more

AP

Alpine Property Preservation

Susanville, CA

Welcome to Alpine Property Preservation, a distinguished leader in light demolition and junk removal services. Our seasoned team combines passion with proficiency to elevate every project to the highest standards. At Alpine, our mission is unequivocal: ensuring the optimal condition... more

House and Garage Demolition Tips for Chester, CA

Project Tips for House & Garage Demolition

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.