A to Z Truck Service offers both trucking and demolition services to the Belleville, Illinois area, providing customers with comprehensive, convenient services. Our team is able to accomplish whatever you throw at us, from concrete removal to house demolition. more
Demolish a Home in Panama, IL
Find the right contractor to demolish and remove anything
America's #1 Source for Local Demolition Experts
Bromley Excavating
Located in Southern Illinois and serving the surrounding areas, Bromley Excavating has been performing comprehensive demolition and excavating services since 1989, including house demolition. more
Diekemper Excavating
Based in Carlyle, Illinois and serving the greater Breese area, Diekemper Excavating specializes in excavation and demolition for residential clients. We can tear down structures of all shapes and sizes, including houses, concrete, mobile homes, barns, and more. more
Gelly Excavating & Construction, Inc.
Gelly Excavating & Construction, Inc. provides commercial and residential construction and demolition services throughout the Metro east area. We perform a wide range of services, including house demolition, concrete removal, and more. more
Nearby Places for House and Garage Demolition
House and Garage Demolition Tips for Panama, IL
Project Tips for House & Garage Demolition
What steps should I take before demolishing my house?
If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:
- Electricity
- Water
- Sewage
- Gas
BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place.
Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.
Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.