16000, 34218, 20860, 15582, 33506, 24634, 33507

Billy Daniel Excavating Inc

Morton, IL

A leader in demolition within in the Morton, IL area since 1995, Billy Daniel Excavating, Inc. is the one to call when you need reliable, affordable... more

BD

Doers Junk Removal LLC

Metamora, IL

From our home base in Metamora, IL, we provide reliable junk removal and light demolition services. Locally owned and staffed by your neighbors, we’re... more

DJ

Ed Hartwig Trucking & Excavating Inc

Henry, IL

Over the last 30 years, Ed Hartwig Trucking & Excavating has grown to provide our community with a wide range of services, including pool removal. Customers can... more

EH

Hulse Excavating

Flanagan, IL

Hulse Excavating works tirelessly for each and every customer we work with. We have earned a reputation for our demolition expertise, integrity, and customer-driven services. ... more

HE

Lance Junk Removal

Peoria, IL

Lance Junk Removal is proud to be the leader for the greater Peoria, IL area in light demolition services, like pool removal, hot tub removal,... more

LJ

MTG Excavating

Chillicothe, IL
4.7
(3)
  • Concrete
  • Decks & Fences
  • Interiors
  • Small Structures
  • Since 2005
  • Free estimates

MTG Excavating can swiftly remove your old swimming pool without disrupting your everyday life. We strive to be the best at what we do and... more

MTG Excavating logo

Peoria Junk Removal

Peoria Heights, IL

There is no job too small or too big for our equipment. We provide our customers with transparent, upfront quotes that are fair. Make sure... more

PJ

Pool Removal Tips for Kappa, IL

A pool fill-in—or partial pool removal—does not involve removing the entire pool, thus saving you time and money. Many homeowners choose this option as it is cheaper, faster, and does not take as long as a full removal. Pool fill-ins work as follows:

  • Drain the pool.
  • Punch holes into the bottom of the pool.
  • Demolish the top layer of the pool (18 in.-36 in.).
  • Place the rubble in the bottom of the pool.
  • Fill in the pool with additional dirt and topsoil.
  • Compact the soil.

Unless your city requires, a partial pool removal can be done without the oversight of an engineering technician. Be sure to confirm this with your contractor and/or local code enforcement entity.