33302, 21272, 20882, 33598, 33591

Walker Reclaim & Demo LLC

Iowa Falls, IA
5.0
(1)
  • Interior Demolition
  • Mobile Home Removal
  • Oil Tank Removal
  • Fast and efficient
  • Stress-free services
  • Free estimates

At Walker Reclaim & Demo LLC, we’re experts in house and garage demolition services designed to streamline your projects and boost efficiency. Our professional team... more

Walker Reclaim & Demo LLC logo

Hands On Excavating LLC

Radcliffe, IA

Hands On Excavating LLC was founded by brothers Jacob, David, Brett, and Brian Handsaker. Growing up on a family farm, we were taught the value... more

HO

Peterson Construction

Webster City, IA

Peterson Construction is a third generation construction company based in Webster City, Iowa. Founded in 1957, we provide customers throughout Central Iowa with comprehensive demolition, including... more

PC

Nieman Excavating, LLC

Kanawha, IA

Choosing Nieman Excavating, LLC means partnering with one of the top industry contractors who will deliver a personalized, seamless house and garage demolition experience from... more

NE

Navratil Excavating, Inc.

Mason City, IA

Navratil Excavating, Inc. is a family-owned business serving North Iowa since 1976. Our skilled workforce and specialized equipment are designed to provide safe, cost-effective house demolition... more

NE

House and Garage Demolition Tips for Galt, IA

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.