At Christian Bros. Excavating L.C., we are experienced in demolition, excavation, grading, earthmoving, and all other soil-related construction work. Based in Sioux Rapids, IA, and servicing the Storm Lake area, we have been in the construction industry... more
Interior Demolition Contractors in Calumet, IA
Find the right contractor to demolish and remove anything
America's #1 Source for Local Demolition Experts
Heinsohn Digging & Tiling
Heinsohn Digging & Tiling is proud to have more than 40 years of experience in the drainage, demolition, and excavation business in Iowa. We utilize our years of experience and the best equipment available to complete each project... more
Raveling Inc
Raveling, Inc, conveniently located in Melvin, IA was founded in 1978 by owner Bruce Raveling. For over 30 years, Raveling's has specialized in crane & equipment rental and services, excavation dirt work, general contracting, and heavy hauling. One of the keys... more
Triple D Contracting, Inc.
At Triple D Contracting, Inc., we own excavators, side dumps, payloads, and skid steer loaders with the ability to knock down and haul away anything from interior walls to multi-story buildings. Contact us today to get a free quote! more
Vander Pol Excavating
Serving the Orange City, Iowa area, Vander Pol Excavating works hard to provide customers with services that exceed their expectations. We set ourselves above the rest with our attention to detail, customer-oriented service, and honest prices. We offer&... more
Nearby Places for Interior Demolition
Interior Demolition Tips for Calumet, IA
Tips for Residential Interior Demolition
How long do remodeling projects take?
If you're planning on remodeling your home, you'll want to plan accordingly. Home remodels take time and money and have several steps, so you'll want to know what to expect.
A common home remodel timeline goes as follows...
- Planning: 1 month
- Demolition: 2 weeks
- HVAC, Electrical & Plumbing: 5 days
- Framing & Drywall: 10 days
- Painting: 1 week
- Cabinets & Fixtures: 1 week
- Doors & Windows: 5 days
- Clean House & Air Vents: 1 day
- Flooring: 1 week
- Trim and Finish Work: 1 week