31878, 33564, 25197, 26297, 27188, 30963

All American Hauling

Osage City, KS

All American Hauling is a veteran owned and operated company that takes pride in what we do. The team at All American Hauling is reliable,... more

AA

Josh Connet Excavation

Manhattan, KS

Josh Connet Excavation's dedicated team of professionals provide exceptional demolition and excavation services at competitive pricing to the Manhattan, KS community. Don't wait—call now... more

JC

Leiser Excavating, LLC

Hartford, KS

Leiser Excavating, LLC is an excavation contractor specializing in a wide variety of demolition jobs, including garage and house demolition.  more

LE

Performance Service Group

Shawnee, KS

Performance Service Group provides light demolition services throughout Shawnee, KS, including concrete removal, deck and fence removal, shed demolition, garage demolition, and more. Contact us... more

PS

Riley's Mobile Home Service, LLC

Topeka, KS
  • Mobile Homes
  • Free estimates

For over 10 years, Riley's Mobile Home Service, LLC has been specializing in mobile and manufactured home repair and demolition services throughout the greater Topeka, KS... more

Riley's Mobile Home Service, LLC logo

TWS Dumpster Rental

Lebo, KS

At TWS Dumpster Rental, we understand how difficult it is to haul waste and get quality demolition services for a fair price, and we are... more

TD

House and Garage Demolition Tips for Admire, KS

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.