24490, 30963, 20417, 25197, 31878

Pearson Demolition

Burns, KS
5.0
(3)
  • Building Demolition
  • Concrete & Asphalt
  • Interior Demolition
  • Licensed and insured
  • Family owned and operated

Owned and operated by a retired Wichita firefighter, Pearson Demolition was founded in 1998 and offers expertise in several key areas, including residential and commercial demolition.... more

Pearson Demolition logo

TWS Dumpster Rental

Lebo, KS

At TWS Dumpster Rental, we understand how difficult it is to haul waste and get quality demolition services for a fair price, and we are... more

TD

Schmidt Excavating LLC

Burlington, KS

For over 30 years, Schmidt Excavating LLC has been serving the Burlington, KS area with our wide variety of services, including garage and house demolition.  more

SE

Leiser Excavating, LLC

Hartford, KS

Leiser Excavating, LLC is an excavation contractor specializing in a wide variety of demolition jobs, including garage and house demolition.  more

LE

All American Hauling

Osage City, KS

All American Hauling is a veteran owned and operated company that takes pride in what we do. The team at All American Hauling is reliable,... more

AA

House and Garage Demolition Tips for Emporia, KS

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.