House Demolition in Beallsville, OH

Find the right contractor to demolish and remove anything

America's #1 Source for Local Demolition Experts

20057, 21056, 19685
Compare Demolition Quotes
EC

Edge Co Inc

Bridgeport, OH

Edge Co Inc. provides the greater Bridgeport, OH community with uncompromising demolition, excavation, and removal services. We make it a point to meet industry standards not just in results, but in our daily safety practices. From removing oil tanks to... more

Larry Lang Excavating logo

Larry Lang Excavating

Beverly, OH
  • Barns
  • Concrete & Asphalt
  • Mobile Homes
  • Since 1997
  • Top-tier equipment
  • Superior customer service

Larry Lang Excavating proudly serves the greater Beverly, OH area with exceptional demolition services. By utilizing top-tier equipment, we can successfully demolish and remove residential and commercial structures of all sizes. more

LE

Litman Excavating Inc

New Martinsville, WV

Litman Excavating & Construction is an experienced and dedicated service provider specializing in demolition, construction, and excavating. A family owned and operated company founded in 1963, Litman performs house demolition, mobile home demolition, and more. more

House and Garage Demolition Tips for Beallsville, OH

Project Tips for House & Garage Demolition

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.