Benny Hempstead Excavating, Inc is a licensed commercial general contractor that specializes in projects of all sizes. The company was founded in 1999 and has ensured its longevity in the industry through providing exceptional quality and service to its customers. We... more
House Demolition in Winchester Bay, OR
Find the right contractor to demolish and remove anything
America's #1 Source for Local Demolition Experts
Johnson Rock Products Inc
For more than 60 years, we have been providing our entire local region with comprehensive demolition services. From complete land leveling to commercial site preparation, Johnson Rock Products has a trained team to get the job done right the first time!... more
Leisure Excavating Inc
Throughout the Eugene, Oregon area, Leisure Excavating Inc has built a reputation on quality, reliable house demolition and excavating services. Our site preparation work is top-notch, and our team of experts is professional, courteous, and responsive. more
Ray Wells Inc
Ray Wells, Inc. offers a wide range of professional services, including house demolition. There is no job too big or too small for us to handle. We have been serving Oregon communities for more than 55 years. more
Nearby Places for House and Garage Demolition
House and Garage Demolition Tips for Winchester Bay, OR
Project Tips for House & Garage Demolition
What steps should I take before demolishing my house?
If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:
- Electricity
- Water
- Sewage
- Gas
BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place.
Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.
Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.