35236, 19598, 20842, 25656, 15663, 31697

Pentoney Brothers Contracting

Berkeley Springs, WV
  • Commercial Demolition
  • Concrete & Asphalt Removal
  • Residential Demolition
  • Family owned and operated
  • Eco-friendly
  • Excellent communication

Contact Pentoney Brothers Contracting for all your pool removal needs! Whether you have an in-ground or above ground pool you'd like removed from your property,... more

Pentoney Brothers Contracting logo

Palmer Construction Co Inc

Mc Connellsburg, PA
5.0
(1)

Founded in 1978, Palmer Construction is a general contractor with a commitment to quality and customer satisfaction. Our team consists of the most dependable, courteous, and... more

PC

Maxwell Trucking & Excavating Inc

State College, PA

Maxwell Trucking & Excavating Inc provides innovative, industry-leading demolition services throughout State College, PA. Our services include commercial demolition, interior demolition, and chimney removal. ... more

MT

Hess Excavating Inc

Mc Connellsburg, PA

Hess Excavating Inc is an excavation and demolition specialist offering top-quality work throughout McConnellsburg, PA. We offer large-scale commercial demolition, backyard pool removals, shed demolition,... more

HE

Marks Brothers Holdings LLC

Huntingdon, PA

At Marks Brothers Holdings LLC, we offer a broad range of services. We strive for complete customer satisfaction at competitive prices. Originally started in the 1960... more

MB

Spangler Excavating

Bedford, PA

Serving Bedford and surrounding areas since 1996, Spangler Excavating does it all. Limited only by your imagination, our services include (but are not limited to): Pool... more

SE

Pool Removal Tips for Calvin, PA

A pool fill-in—or partial pool removal—does not involve removing the entire pool, thus saving you time and money. Many homeowners choose this option as it is cheaper, faster, and does not take as long as a full removal. Pool fill-ins work as follows:

  • Drain the pool.
  • Punch holes into the bottom of the pool.
  • Demolish the top layer of the pool (18 in.-36 in.).
  • Place the rubble in the bottom of the pool.
  • Fill in the pool with additional dirt and topsoil.
  • Compact the soil.

Unless your city requires, a partial pool removal can be done without the oversight of an engineering technician. Be sure to confirm this with your contractor and/or local code enforcement entity.