Commercial Building Demolition in Cotton Center, TX

Find the right contractor to demolish and remove anything

America's #1 Source for Local Demolition Experts

15252, 23736, 32423
Compare Demolition Quotes
JB

Judge Backhoe Service

New Deal, TX

Judge Backhoe Service LLC is an owner-operated excavation and waste removal specialist serving the Lubbock, TX area. Our team is able to take on a wide range of services, including commercial demolition.  more

RR

R & R Ditching

Lubbock, TX

With over 150 years of combined experience, the staff at R & R Ditching is our community's number one choice for all their commercial needs. We are able to accommodate all outdoor demolition projects. more

FD

Flips Demolition & Renovation

Lubbock, TX

At Flips Demolition & Renovation, we offer an unparalleled commitment to customer satisfaction and work diligently to provide the level of service customers have come to expect from our team. Reach out for a free commercial demolition quote today. more

Commercial Demolition Tips for Cotton Center, TX

Tips for Demolishing a Commercial Building

Should I consider deconstructing a commercial building?

Commercial deconstruction is the process of taking apart the structure piece-by-piece; the goal being to salvage as much of the materials inside as possible.

This process is much more time-consuming than traditional mechanical demolition, but it can be quite rewarding.

Salvaged materials can be recycled, re-used, or sold, which could help offset the upfront cost.

How much does commercial demolition cost per square foot?

According to national averages, commercial demolition costs roughly $4-$8 per square foot. As square footage goes up, the cost per square foot can go down.

There are a number of things that can affect the cost of your project.

Common factors that influence the total cost of commercial demolition include:

  • Type of materials being demolished
  • Total square footage being demolished
  • Cost of living in your area
  • Accessibility of the work site
  • Demolition method used (by hand or with heavy machinery)
  • Complexity of the project
  • Presence of asbestos or other hazardous material
  • Who you hire

Learn more about deconstruction: