16689, 33001, 21944, 20780, 24033, 30703

D&G Multi Services

Prince George, VA
5.0
(2)
  • Concrete & Asphalt Removal
  • Interior Demolition
  • Structural Demolition
  • Family business
  • Detail oriented
  • Transparent pricing

When it comes to barn demo, D&G Multi Services does it all, allowing us to transform your property in minimal time, efficiently, and for... more

D&G Multi Services logo

Remove A Pool Virginia

Fairfax, VA
5.0
(1)
  • Pool Removal Specialists
  • Satisfaction guaranteed
  • Free estimates

Remove A Pool is a full-time, dedicated demolition company with the skills, experience, and equipment needed to tackle even the most challenging demolition projects, including... more

Remove A Pool Virginia logo

The Wayne Group

Achilles, VA

The Wayne Group is an award-winning demolition company serving Metro Washington D.C. and the Mid-Atlantic Region. We specialize in barn and building demolition, as... more

The Wayne Group logo

J. Sanders Construction Co.

West Point, VA

J. Sanders Construction Company was founded in 1984. Since that time we have gained recognition as one of the leading companies in earthwork, the construction of... more

JS

Kniatt Construction LLC

Williamsburg, VA
5.0
(1)

Serving the Williamsburg community since 1988, Kniatt Construction is a family owned and operated company with more than 25 years of experience. We specialize in demolition services,... more

KC

Grit Hounds Junk Removal

Norge, VA

Grit Hounds Junk Removal is a veteran-run company servicing the greater Williamsburg area. Our crew can perform a wide variety demolition services in a timely... more

GH

Barn Demolition Tips for Mascot, VA

Who is responsible for barn demolition debris?

Make sure you discuss who will be responsible for hauling away and disposing of the debris left over after your barn demolition. Not all contractors handle this, although some do, so this is something you will want to verify before demolition begins.

Oftentimes, there is salvageable wood in a barn, so consider salvaging as many re-useable materials as you can before the demolition.

Keep reading: