34728, 34727, 34115, 34114, 34113

Cochran & Son Construction

Clarksburg, WV

Providing trusted construction and demolition services in Clarksburg, WV, and nearby communities, Cochran & Son Construction is here to help. Call us today or request a... more

CS

WV Contracting LLC

Bridgeport, WV

At WV Contracting LLC, our knowledge and experience in excavation and demolition set us apart. Thinking about pool removal? Contact us for a quote or... more

WC

Teter Excavating LLC

Elkins, WV

At Teter Excavating LLC, we are experienced in all that we do, so you can trust that your project will be done right. We have... more

TE

Ayers Excavating LLC

Elkins, WV

Ayers Excavating LLC is a licensed & insured general contractor providing a wide range of residential and commercial demolition services throughout Elkins, WV and the surrounding... more

AE

Reclaim Company, LLC

Fairmont, WV

Reclaim Company's ability to provide all aspects of both structural and selective demolition services is what sets us apart in the industry. When we're involved,... more

RC

Pool Removal Tips for Buckhannon, WV

A pool fill-in—or partial pool removal—does not involve removing the entire pool, thus saving you time and money. Many homeowners choose this option as it is cheaper, faster, and does not take as long as a full removal. Pool fill-ins work as follows:

  • Drain the pool.
  • Punch holes into the bottom of the pool.
  • Demolish the top layer of the pool (18 in.-36 in.).
  • Place the rubble in the bottom of the pool.
  • Fill in the pool with additional dirt and topsoil.
  • Compact the soil.

Unless your city requires, a partial pool removal can be done without the oversight of an engineering technician. Be sure to confirm this with your contractor and/or local code enforcement entity.