Demolish a Home in Fence, WI

Find the right contractor to demolish and remove anything

America's #1 Source for Local Demolition Experts

23100, 19087, 23645, 20103
Compare Demolition Quotes
BE

Bar Enterprises Inc

Iron River, MI

For more than 20 years, Bar Enterprises, Inc. has been providing reliable, cost-effective demolition and excavation services to residential and commercial clients. Demolition, grading, and digging basements are just a few of the quality services they offer. more

BE

Berg Enterprises

Pembine, WI

Berg Enterprises provides unparalleled house demolition services to our fellow community members. We offer excavation, grading, septic removal and installation, grading, and much more. more

LS

Lemanski & Son Excavating

Florence, WI

Lemanski & Son Excavating is Florence, WI's leading excavation and demolition provider. Our team is able to accomplish whatever you throw at us, including garage and house demolition.  more

RE

Ryan's Excavating

Iron River, MI

Since 2004, Ryan’s Excavating serves Upper Michigan and Northern Wisconsin in all their residential, commercial, and civil excavating and demolition needs. Their team of specialists is proficient in home demolition, septic system design and installation, landscaping, and much more. more

House and Garage Demolition Tips for Fence, WI

Project Tips for House & Garage Demolition

What steps should I take before demolishing my house?

If you're starting to think about demolishing your house, a crucial step in the process is disconnecting existing utility services. There are a variety of utilities and services that must be disconnected before demolition:

  • Electricity
  • Water
  • Sewage
  • Gas

BEWARE: Electricity and gas pose a particularly dangerous health risk if still active when demolition takes place. 

Surrounding supply sources can also be damaged if services have not been properly terminated. Neighboring homes can be at risk of losing services, and local power, gas, water, or drainage infrastructure can be affected, too.

Note: Most service termination requests need to be made in writing to the supply company two or more weeks prior to demolition. This will help ensure the company has enough time to terminate the service before demolition begins.